FLOWSHEET APPLICATION
Cu Recovery Prediction for Year 2023
The integrated flowsheet was employed to project copper
recovery from March to December 2023 as part of the
mine’s medium-term planning. Currently, the mine uti-
lizes a Geomet model to forecast copper recovery for its
operations. In Figure 8, a comparison of copper recovery
between the IES model prediction and the Geomet model
prediction reveals a reasonably strong agreement. However,
it is crucial to note that the throughput was maintained at
-25%
-15%
-5%
5%
15%
25%
35%
45%
5000
5500
6000
6500
7000
7500
8000
8500
Error Actual IES
Figure 6. Actual and IES predicted plant daily throughput for September 2022
-25%
-5%
15%
35%
55%
75%
95%
150
160
170
180
190
200
210
220
230
240
Error Actual IES
Figure 7. Actual and IES predicted plant daily grind size for September 2022
the same level as the Geomet model throughput during the
model development phase.
Figure 9 illustrates the potential for further improve-
ment in copper recovery through the IES model compared
to the Geomet model prediction. This enhancement can be
achieved by optimizing the grinding process, as highlighted
in the figure.
The two figures above illustrate that by optimizing the
grinding process through the IES model, there is potential
for enhanced copper recovery in the plant compared to the
GEOMET model prediction.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Monthly
Error
(%)Throughput
(t/h)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Monthly
Error
(%)
Grind
Size
(μm)