in the East coordinate, it ranges between 2 cm and 5 cm.
These values indicate that the displacement is minimal.
Figure 11 shows that, in the waste dump, the varia-
tion in the North coordinate ranges from 3 mm to 5 cm.
Additionally, the structure stabilizes in 2019, as its value
begins to approach 0. In the previous years, the values were
minimal, within the millimeter range.
Point HCC1 exhibits a variation of approximately
5 cm over time, point HCC2 varies by 4 cm, and point
HCC3 shows a variation of 3 mm.
Figure 12 shows the variation in the East coordinate
at the three points considered as milestones from 2006
to 2022. At these points, the variation ranges from 2 cm
to 5 cm. Additionally, stabilization is reached in 2019. At
point HCC1, the variation is 2 cm at point HCC2, it var-
ies by 3 cm and at point HCC3, the variation is 5 cm.
Figure 13 shows that the elevation variation ranges
from 4 cm to 6 cm based on the analysis conducted from
2006 to 2022. Additionally, stabilization begins in 2019,
at which point no further movement is observed. At point
HCC1, the variation is 4 cm at point HCC2, it varies by 6
cm and at point HCC3, the variation is 5 cm.
For the analysis of the waste dump and our calculations
of displacement velocity, total displacement, direction of
HCC1
HCC2
HCC3
9255710
9255715
9255720
9255725
9255730
9255735
9255740
9255745
9255750
759120 759130 759140 759150 759160 759170 759180
Variation of the CDC-1 Waste Dump
2006 -2022
2006 2022
Figure 10. Zone of the waste dump at each monitoring milestone
HCC1
HCC2
HCC3 9255714.00
9255722.00
9255730.00
9255738.00
9255746.00
North Variation -Waster Dump CDC-1
2006 -2022
Figure 11. Variation in the North Coordinate of the CDC‑1 Waste Dump from 2006 to 2022
Apr-06 Aug-07 Oct-07 Jan-08 Apr-08 Aug-08 Jan-09 Apr-09 Jun-09 Jan-10 Jul-10 Jan-11 Oct-11 Dec-13 Oct-14 Dec-14 Jun-15 Dec-15 Jun-16 Nov-16 Dec-17 Jun-18 Dec-18 Jun-19 Nov-19 Dec-20 Jun-21 Jun-22 Dec-22
in the East coordinate, it ranges between 2 cm and 5 cm.
These values indicate that the displacement is minimal.
Figure 11 shows that, in the waste dump, the varia-
tion in the North coordinate ranges from 3 mm to 5 cm.
Additionally, the structure stabilizes in 2019, as its value
begins to approach 0. In the previous years, the values were
minimal, within the millimeter range.
Point HCC1 exhibits a variation of approximately
5 cm over time, point HCC2 varies by 4 cm, and point
HCC3 shows a variation of 3 mm.
Figure 12 shows the variation in the East coordinate
at the three points considered as milestones from 2006
to 2022. At these points, the variation ranges from 2 cm
to 5 cm. Additionally, stabilization is reached in 2019. At
point HCC1, the variation is 2 cm at point HCC2, it var-
ies by 3 cm and at point HCC3, the variation is 5 cm.
Figure 13 shows that the elevation variation ranges
from 4 cm to 6 cm based on the analysis conducted from
2006 to 2022. Additionally, stabilization begins in 2019,
at which point no further movement is observed. At point
HCC1, the variation is 4 cm at point HCC2, it varies by 6
cm and at point HCC3, the variation is 5 cm.
For the analysis of the waste dump and our calculations
of displacement velocity, total displacement, direction of
HCC1
HCC2
HCC3
9255710
9255715
9255720
9255725
9255730
9255735
9255740
9255745
9255750
759120 759130 759140 759150 759160 759170 759180
Variation of the CDC-1 Waste Dump
2006 -2022
2006 2022
Figure 10. Zone of the waste dump at each monitoring milestone
HCC1
HCC2
HCC3 9255714.00
9255722.00
9255730.00
9255738.00
9255746.00
North Variation -Waster Dump CDC-1
2006 -2022
Figure 11. Variation in the North Coordinate of the CDC‑1 Waste Dump from 2006 to 2022
Apr-06 Aug-07 Oct-07 Jan-08 Apr-08 Aug-08 Jan-09 Apr-09 Jun-09 Jan-10 Jul-10 Jan-11 Oct-11 Dec-13 Oct-14 Dec-14 Jun-15 Dec-15 Jun-16 Nov-16 Dec-17 Jun-18 Dec-18 Jun-19 Nov-19 Dec-20 Jun-21 Jun-22 Dec-22