8
mine and deposit, there is further research and development
needed in the coming years. The next step is to implement
the core algorithms of the tool for other deposits, such as
ore deposits with complex grade distributions, as well as
for other mining methods and technologies. The long-term
goal is to establish a database for calculation methods, cost
data, and to make the tool more universally applicable to
various mining operations.
REFERENCES
[1] Cost Estimation Handbook. 2nd ed. Carlton, 2012.
Monograph. 27. 978-1-9215-2278-9.
[2] Durchholz, Rüdiger and Florian Beier (DMT
Group). Mine planning at DMT. Video conference.
9 November 2022.
[3] Graner, Thomas (G.E.O.S. Ingenieurgesellschaft
mbH). Mine Planning at GEOS. Interview. 17
August 2022.
[4] Kleinsorge, Thomas and Tony Saldana (Saxore
Bergbau GmbH). Mine planning at Saxore Bergbau
GmbH. Meeting. 24 August 2022.
[5] Martínez, Yerko (SRK Consulting (UK) Limited).
Development of an automated calculation tool for the
planning of underground mines. Video Conference.
24 November 2022.
[6] Taylor, Rick and Bryan Pullmann (SLR Consulting
Limited). Mine Planning -Calculation. Video
Conference. 6 December 2022.
[7] Gorzkos, Richard. Underground Mining Cost Estimates
First Principles Estimating and Cost Model Output
Formats [online] [viewed 2 August 2023]. Available
from: https://ripago.com.au/underground-mining
-cost-estimates-first-principles-estimating-and-cost
-model-output-formats/.
[8] Günther, Franziska. Untersuchungen an einem
automatisierten Kalkulationstool zur Planung unter-
tägiger Bergwerke (in German). Investigations into an
automated calculation tool for planning underground
mines. Doctoral Thesis at TU Bergakademie Freiberg,
Germany, 6 Feb. 2024. 9783860127117.
[9] Camm, Thomas W. and Scott A. Stebbins. Simplified
Cost Models For Underground Mine Evaluation. A
Handbook for Quick Prefeasibility Cost Estimates. Buute,
Montana, USA: Montana Technological University,
Mining Engineering Department, 2020. Available
from: https://digitalcommons.mtech.edu/cgi
/viewcontent.cgi?article=1015&context=mine_engr.
[10] Camm, Thomas W. Simplified cost models for prefea-
sibility mineral evaluations. Washington, D.C.:
U.S. Dept. of the Interior, Bureau of Mines, 1991.
Information circular 9298. Available from: https://
pubs.usgs.gov/unnumbered/70138816/report.pdf.
[11] Hartman, Howard L., ed. SME Mining Engineering
Handbook. 2nd ed. Littleton: Society for Mining
Metallurgy and Exploration, 1992. 0-873351-00-2.
[12] MAFMINE [viewed 6 November 2024]. Available
from: https://www.mafmine.com.br/v3/.
[13] Petter, C., A. Young, V. Araújo, F. Cantini, R. Petter,
J. Oppermann, T. Fernandez, R. Darrigo, I. Da
Costa, V. Lenz, V. Juchen, H. Souza, and L. Wives. A
quick evaluation tool for CAPEX and OPAX applied
to mining operations and esg mitigation. Preprint
22-060. SME Annual Meeting. Salt Lake City, USA.
27.02–02.03.2022.
[14] Rudenno, Victor. The mining valuation hand-
book. Mining and energy valuation for investors and
management. 4th ed. Milton: John Wiley, 2012.
978-0-7303-7708-5.
[15] Hustrulid, W. A., and Richard C. Bullock, eds.
Underground mining methods. Engineering fundamen-
tals and international case studies. Littleton: Society
for Mining Metallurgy and Exploration, 2001.
0-873351-93-2.
[16] Costmine. SHERPA for Underground Mines [online]
[viewed 6 November 2024]. Available from: https://
www.costmine.com/sherpa/sherpa-underground/.
[17] Hauptverband der Deutschen Bauindustrie, and
Fachverband der Bauindustrie Österreichs, eds.
BGL Baugeräteliste 2020: Technisch-wirtschaftliche
Baumaschinendaten (in German). BGL Construction
Equipment List 2020: Technical and economic construc-
tion equipment data. 1. Auflage. Gütersloh: Bauverlag
BV GmbH, 2020. 978-3-7625-3690-1.
[18] InfoMine USA, Inc., Glacier Resource Innovation
Group. Costmine -Industry Standard for Mining Cost
Estimating [online] [viewed 11 November 2022].
Available from: https://www.costmine.com/.
[19] Günther, Franziska and Helmut Mischo. Interner
Bericht: Verifizierung des Kalkulationstool für die
Vollkostenrechnung des Bergwerkes Großsteinberg (in
German). Internal report: Verification of the calcula-
tion tool for the full cost calculation of the Großsteinberg
mine, 25 Sep. 2024.
Previous Page Next Page