6
Figure 4. Base Case mine plan (Case C: mill only, with stockpiling): tons, grade and contained metal mined ≥ 0.02 oz/ton cut-
off for nine orebody conditional simulations
Figure 4. Base Case mine plan (Case C: mill only, with stockpiling): tons, grade and contained metal mined ≥ 0.02 oz/ton cut-
off for nine orebody conditional simulations