XXXI International Mineral Processing Congress 2024 Proceedings/Washington, DC/Sep 29–Oct 3 3879
Figure 4. Simulated liner worn geometry compared with measured liner worn geometry
0
40,000
80,000
120,000
160,000
200,000
240,000
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
0 5 10 15 20
Time (seconds)
VTM-1500-wear, Power and Media Mass
Power-W Media Mass
Figure 5. Power draw and ball loading vs time
Me
dia
Ma
ss (kg)
Power(W)
Figure 4. Simulated liner worn geometry compared with measured liner worn geometry
0
40,000
80,000
120,000
160,000
200,000
240,000
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
0 5 10 15 20
Time (seconds)
VTM-1500-wear, Power and Media Mass
Power-W Media Mass
Figure 5. Power draw and ball loading vs time
Me
dia
Ma
ss (kg)
Power(W)