3072 XXXI International Mineral Processing Congress 2024 Proceedings/Washington, DC/Sep 29–Oct 3
Figure 17. Recovery results of Au and Te and Mass pull as a function of Au grade obtained through the
online XRF analyzer of the plant between Dec 08, 2023, and Dec 26, 2023
Figure 18. Recovery results of Au and Te and Mass pull as a function of Au grade obtained plant’s daily
composition samples analyzed by the chemical laboratory between Dec 08, 2023, and Dec 26, 2023
Figure 17. Recovery results of Au and Te and Mass pull as a function of Au grade obtained through the
online XRF analyzer of the plant between Dec 08, 2023, and Dec 26, 2023
Figure 18. Recovery results of Au and Te and Mass pull as a function of Au grade obtained plant’s daily
composition samples analyzed by the chemical laboratory between Dec 08, 2023, and Dec 26, 2023