XXXI International Mineral Processing Congress 2024 Proceedings/Washington, DC/Sep 29–Oct 3 1885
Figure 7. The individual effect plots of the input parameters for Ni recovery (%):(a) grind time (b) catalyst dosage
(c) H
2 SO
4 concentration (d) leaching time (e) leaching temperature
Previous Page Next Page